Table of Contents

Logbook CMS Muons IPNL

Derniers resultats

FEBV2 test with PETIROC 2C

Calibration du FEBV1 450 fC

Documentation for data taking

DAQ Instruction (FEBv1b: 09.10.19)

DAQ Instruction (FEBv1b: 28.10.2020)

Documentation for data analysis

dataQuest: Analysis DOME - instruction (2020)

dataQuest: Analysis - instruction (2018)

All RUNS

FEBv1.1b

FEBv1

FEBv0

Octobre 2017

Mesure sur le PCB 1.2 mm 160 cm + FEB 0

Summary of FEB measurement with 1.2 mm thick PCBs

Novembre 2017

Mesure sur le PCB 0.6 mm 160 cm + FEB 0

Setup

Photos de la maquette au Dome

Calibrations

Calibration des Board FE#2 et FE # 4

Calibration du board FE#1

Calibration des boards avec l'injection sur les lemos

Decembre 2017

variation des delais d'injection

Buffer structure

mesure sur le detecteur au cern

mesures d'impedance a Lyon

Access to n1470 HV module

brooks 0154

Cosmic a Lyon

mesure de l'humidite et de la temperature du gaz

Janvier 2018

DAQ user 2018/01/03 09:40

Nouveaux runs cosmiques

DAQ user 2018/01/17 14:55

Melange Isobutane

Installation du FE 5

Etude supplementaires/complemnetaires pour RPC2018

Calibration du FE 5

Fevrier 2018

New measurement @ cern

Mars 2018

Reading a file in a buffer

New measurement @ cern Mars

Test des nouveaux FEBs

LYDAQ installation and usage

preparation beam test avril 2018

Avril 2018

COSMIC

Installation and commissioning of cable chamber

Installation and commissioning of return strip chamber


TEST BEAM GIF

SETUP SETTING


Expert shifter instruction for GIF++

Shifter instruction for GIF++


tables

Mai 2018

Upgrade of readout firmware

Juin 2018

Status of the upgrade of readout firmware

Test of return line chamber with new firmware

Post test beam tests in 904 of the COAX chamber

JUillet 2018

New firmware on both chambers

dataQuest: Analysis - instruction


Cosmic data taking in 904

GIF++ test JULY


August 2018

GIF++ runs info

Resume du test sur faisceau

September 2018

Test sur faisceau H2

October 2018

MDCC pour CMS iRPC

MDCC pour SDHCAL-ECAL

904_GAP_TESTS

November 2018

FEBV1 debugging

December 2018

BE FE communication frame format

Janvier 2019

Debug FEB V1 version 1

Mars 2019

IPNL DOME runs info
CERN COSMIC904 runs info

mai 2019

Time delay measurements at 904

Pedestals at 904

Time delay measurements at 904 on 13 may with new firmware

Mesure d'injection a Lyon

FebV2 firmware requirements

FebV in GIF++

Calibration du CCCP

Juin 2019

C'est fini ?

Novembre 2019

Test des chambres CMS pour PULSALYS

January 2020

Documentation MongoRoc

December 2020

Test du prototype (EM888) avec un tracking