Installation and commissioning of cable chamber

Geometry

Four FEBs intsalled from external to middle:

  • TDC 5, First serie
  • TDC 8, Second serie
  • TDC 6, second serie
  • TDC 7, second serie

Each of it is reading 12 strips both side. The mapping of the 12 strips is the following:

1 10 559 14 539
2 6 558 11 538
3 2 557 7 535
73897084 0 556 3 537
73897185 4 555 1 536
73897286 8 554 5 537
73897387 12 554 9 540
73897488 16 565 13 542
73897589 18 556 15 539
738976810 20 558 17 538
738977811 22 558 19 539
738978812 non non 21 539